Belgium is a pioneer in the offshore wind market, having built its first offshore wind farm in 2009. The further development of the Eastern Zone, consisting of 9 concessions with a total installed capacity of 2.2 GW, was completed in 2020. This early entry into the market obviously means that Belgium will also be at the forefront of the challenging repowering of a large offshore zone. However, the combination of incoherent concessions in terms of time (non-aligned start and end dates) and space (scattered small parcels) with specific legal and technical limitations makes it a complex matter, as illustrated in Figure 1. In addition, the development of offshore wind in neighboring countries will have a significant impact on repowering strategies in the Belgian zone. The increasing number and size of wind farms in the North Sea, particularly in French, Dutch and British waters, will affect the wind resources and wake effects in Belgian waters. An outlook of North Sea wind farm development is provided in Annex. 


In addition, the timely start of offshore development also led to the use of older wind turbine technologies and sub-optimal farm and concession zones and layouts, which now pose additional challenges to repowering efforts. Furthermore, wind farms have become significantly larger in terms of overall capacity (from 300 MW to 1-1.5 GW). 

Objectives

BePoweringaims to identify and quantify the optimal repowering strategies for the Belgianoffshore zone up to 2060, maximizing both energy production during the transition periodand long-term output after repowering. The project will determine how differentrepowering scenarios perform in the broader context of increasing wind farm developmentin the Southern Bight of the North Sea and the associated wake and blockage effects onthe Belgian zone.


To achieve this,BePoweringsets two main objectives:

  • Provide a better understanding on the factors influencing the power production in the Belgian offshore zone to have a better insight on the maximal potential of the energy extraction of this zone. 
  • Increase the flexibility of the results by capturing the effects and sensitivity of various repowering decisions by exploring a plenitude of different combinations of various policy, legal and technical factors (division of lots, date of repowering, repowering production loss factor, wind farm density, etc.) using fast models. 


Ambition

The ambition of the BePowering project is to create a new dedicated visualizer to dynamically display the outcomes of the project. The visualizer allows direct comparison of scenarios based on varying input parameters. For example, the effect of grouping concessions, additional corridors or more optimal wind farm layout can quickly be evaluated.  

Thanks to the flexibility and accuracy of the results, the visualizer will assist policy makers to support and evaluate decisions to ensure the security of supply during transition region while minimizing the cost of energy. It will, for example, assist the regulator CREG to understand the effects on the electricity network during the repowering phase (between 2035 – 2060) to fulfil their advisory role. This will help to objectify the discussions and make them fact-based rather than opinion-based.